Simone Tabellini
#marketing#mistakes

150 mistakes as a CMO

A guide to the mistakes I made doing marketing in a startup, and to spotting them when they come back.

One day, on the bus, I asked Claude something simple: line up every mistake I've made as CMO of play2match. All of them. The wasted time, the messages never sent, the things written down and never done.

I thought it would be a short list.

It came out at more than 150 in five months 😅 (well, at least I'm consistent).

The good news is they're not 150 different mistakes. They're always the same nine, coming back in a different jersey. This guide goes through them one by one. I won't pretend to tell you how to do marketing in a startup, but if you do it, you're making some of these too.

How I counted them

I had Claude read everything play2match marketing wrote from June to October 2026: the work diary, the Monday reports, call notes, event retros, weekly plans, the task board. Plus material from the rest of the team, because lots of mistakes are easier to see from the outside.

That gave 132 work episodes (some seen from two sides), plus 54 corrections I made to the AI's work (more on that in the bonus chapter). Minus duplicates, more than 150. By type, the 132 episodes break down like this:

Type of mistakeShare (rounded)
Written and not done: commitments, plans, promises, stalled tasks23%
Numbers and method: wrong metrics, definitions, estimates21%
Handovers and communication: who presses the button, who knows14%
Wasted time: duplicates, systems rebuilt or thrown away14%
Operational mistakes in ads and CRM tools13%
Reversed decisions12%
Time spent outside my lever2%

The first thing that struck me: almost 40% are execution mistakes, not skill mistakes. Things written and never closed, handovers without a name. On ads, CRM and numbers I knew what to do. My weak spot was closing the work and getting it to the right people.

The second: the month with the most mistakes is August, with 51 episodes against 7 in June. But August is also when I started writing everything down. A mistake you don't write down, you don't count, and you don't learn from. In the same way October looks calmer, but lots of mistakes you only discover weeks later (see mistake 06).

  1. Mistake 01

    I drew plays on the whiteboard instead of playing the game

    The story

    In basketball there's a kind of coach who spends the timeout drawing plays on the clipboard while his team is down by 20. Well, that was me.

    For two weeks straight I didn't close a single task. A few days later, in 48 hours, I created four new AI agents.

    I rebuilt a campaign log on Notion from scratch, decision log and procedures included, and threw it away a month later, because it was copying by hand what Meta already records on its own. I rebuilt the same report from scratch four times. In September half the time I spent with Claude went into maintaining systems, and only a fifth went into the lever I'm measured on.

    Building a system gives you the feeling of moving forward without the risk of a number that doesn't move. That's exactly why it's so comfortable.

    What it cost me
    A month of work on a log I threw away, and weeks where the system kept growing while the lever stood still.
    The warning sign
    A week where you closed nothing important but created something new to organise the work. A tool, a dashboard, an automation, a template.
    The countermove
    A new system only makes sense if it replaces something you've already done by hand at least three times. And if one comes in, another one goes out the same day.
  2. Mistake 02

    Writing a task is free, closing it isn't

    The story

    Since I started working with AI, writing a task costs nothing. The result: from August I was creating about 80 a month. Before, I created 8.

    Guess how many I closed? Just over half.

    On my weekly plans I hit 8 commitments out of 34. The “High” priority had become the default for whoever wrote the task: it closed one task in three. I wrote the rule “every task has a deadline” in June, then again in my role agreement, and in ten weeks I didn't respect it once.

    What it cost me
    A to-do list so long it no longer helped me choose. When everything is “High”, nothing is.
    The warning sign
    This week you created more tasks than you closed. Or you're rewriting the same commitment for the third time, with a new date.
    The countermove
    The bottleneck is no longer the idea, nor writing it down. It's closing it. A task is born with a date and with the number it has to move, otherwise it's an idea and goes in the ideas drawer. A commitment missed twice gets smaller or gets killed, it doesn't get rewritten as is.
  3. Mistake 03

    The things I can't do are the first ones I put off

    The story

    We launched a new city one weekend in October. The press release went out four days later.

    As in: after.

    It wasn't bad luck. It was a commitment I'd made at the start of the month and kept pushing back. Same story with reviews: almost every task on that topic was weeks overdue. Ads, landing pages, CRM, community: there I know where to put my hands. PR and reviews, no, and in fact they were always at the bottom of the list.

    What it cost me
    A launch with no press, and a whole topic (reviews) stuck for months.
    The warning sign
    A topic you've been putting off longer than the others, always with a different excuse.
    The countermove
    Look at what you've been putting off the longest. That's where your skills gap is, not your lack of time. You either learn that topic, hand it to someone who knows how, or take it off the list. Leaving it there is the worst choice.
  4. Mistake 04

    “Someone needs to take care of it” is not a name

    The story

    This is the one that stings the most.

    Creatives marked to be switched off, left running for three weeks. Not because nobody knew, but because nobody had said who pressed the button. As someone on the team wrote: “we need to say out loud who presses the button”.

    A project that changed owner five times in just over three months, and in one of those handovers I was the one passing the ball back.

    A city's ads switched off for a test, to be switched back on after a week. They stayed off because we were waiting for a confirmation that nobody had the job of giving. In those two weeks the number of new people coming to play halved.

    And then the messages: after a launch, the retro showed that information wasn't flowing between areas. I was sending six messages with urgent to-dos to someone who'd had their plan scheduled for days.

    What it cost me
    Two weeks with half the new people in one city, three weeks of money on creatives we already knew weren't working.
    The warning sign
    Someone on a call says “someone needs to take care of it”. Or something has been waiting on another person for more than a week and nobody has asked how it's going.
    The countermove
    Every handover has three things written down. Who presses the button, by when, how I know it's done. And whoever owns the task tells the others when it's their turn, not the other way round.
  5. Mistake 05

    The decision made on a call that never lands anywhere

    The story

    In September I changed an important target. Rightly, in my view. Except I wrote it in my own files, and the confirmation in the document everyone read arrived almost six weeks later: in the meantime two different numbers were going around for the same thing.

    A metric definition agreed in May didn't make it into the right document until September: for three months we measured it the old way. And I changed a choice about our retargeting campaigns four times in seven weeks, so much that the automated report kept asking me to do something I'd already cancelled.

    What it cost me
    Three months read with the wrong yardstick, and six weeks where the team was looking at two different goals.
    The warning sign
    The same target, the same date or the same owner written differently in two places.
    The countermove
    A call without a line written in the right place is just a chat. The decision gets written the same day, and whoever it affects hears it from whoever made it.
  6. Mistake 06

    The wrong number, found out later

    The story

    The app store conversion rate we kept quoting was off by about three times.

    We spent two months chasing an SEO problem that didn't exist: the pages were there, we were just looking at the wrong dashboard.

    For ten days we tracked an event against 64 spots, when the real spots were 48. Alarms, recovery plans, worried messages... over a gap that was partly non-existent.

    What it cost me
    Two months diagnosing a fake problem, ten days of alarms, and decisions made on numbers that didn't measure what we thought.
    The warning sign
    You're about to decide on a number you received, not one you checked. Or the same figure has two values in two documents.
    The countermove
    Before building a decision on top of it, check what that number really measures and where it comes from. Two minutes of checking are worth ten days of alarms. And the quarter's target doesn't change halfway through, unless you want no result to be judgeable anymore.
  7. Mistake 07

    The button pressed at 7:50 pm, and nobody looking the day after

    The story

    One afternoon I made 173 changes to our Meta campaigns in three and a half hours. The next day some campaigns showed as active with not a single ad inside, and stayed that way for a day and a half.

    One city's campaigns spent in another city for days, because when we duplicated an ad set the location stayed the old one.

    A countdown for a launch event: of more than a thousand people who were supposed to enter the automation, 12 got in.

    An email sent to more than 13,000 people in other cities for a launch: zero bookings, 87 unsubscribes. 87 people from the crew who no longer want our emails, lost for nothing.

    What it cost me
    Campaigns stuck, money spent in the wrong city, a countdown that reached almost nobody, 87 people we'll never hear from by email again.
    The warning sign
    You've just made lots of changes in a single session, started an automation or duplicated a campaign. The faster you're going, the more this signal matters.
    The countermove
    The day after any big change, you check that it really went live and that it's spending where it should. I had all the rules written down. A rule in a document doesn't stop you while you're moving fast, a check built into the flow does.
  8. Mistake 08

    Events were eating my lever

    The story

    In June, in the team's sprint recap, it was written plainly: I was spending half my time on events. I'm the CMO, my job is the acquisition engine.

    Four months later the numbers say this: over ten weeks the lever I'm measured on got on average less than a fifth of my hours, and in the week of a launch events took 42%.

    Events are the best thing about play2match, which is exactly why it's so hard to say no to them 💛 The problem is that at every event we made the same mistakes again. At the Rome launch four problems were identical to the ones in Milan, three months earlier. We'd been talking about a playbook for months, but we didn't write it.

    What it cost me
    The lever I'm judged on stayed at the bottom of my week for months.
    The warning sign
    A block of work on your lever moved to make room for an event. Or the same problem at two events in a row.
    The countermove
    If an event runs over, you move the event, not the lever. And an event you run three times deserves a playbook, not another sprint. If events aren't your job, hand them to whoever should run them, with a date.
  9. Mistake 09

    I bought demand we couldn't serve

    The story

    This is the most CMO mistake of them all.

    In August we were bringing in about 1.7 times the people our courts could get playing. In one city we signed up more than 1,500 people in five weeks with a single sports centre. We were paying today for people who would play in January.

    And before that I was opening courts even the day before because between 7 and 10 people were on the waiting list. Then those people didn't book.

    What it cost me
    Sign-ups we'd paid for who couldn't find a spot, and open courts that stayed empty.
    The warning sign
    Sign-ups growing faster than available spots. Or using a waiting list as proof that people want to play.
    The countermove
    In a community that plays in real life, marketing isn't “more sign-ups”. It's people who find a place to play. The budget follows the courts, not the other way round. And to size an event you count who actually books, not who's on the list.

Bonus: the mistakes I had the AI make

I do a big part of my work with Claude. And in five months I corrected it 54 times: a badly laid-out email, a wrong link in a push notification, a report built on the wrong method, an automated routine started before knowing whether it was needed.

Every time I did the sensible thing: I wrote a rule, so it wouldn't happen again.

It happened again. On emails and push notifications there were 11 corrections, and twice the same mistake came back on the same day. Once a wrong link ended up in a campaign that had already gone out, even though the rule to prevent it was there.

A written rule doesn't stop a mistake that happens while you're moving fast. A check built into the flow does, at the moment you press the button or the day after. And AI doesn't change the nature of the problem, it changes the speed: you write, build and send ten times faster, so you get things wrong ten times faster, unless you have a point where you stop and look.

The mistake I'm making right now

Reading this list, I felt the most obvious temptation: build a system so I don't repeat these mistakes. Another agent, another dashboard, another routine.

Which is exactly mistake number one 😅

So the real move is to take away, not add. No new systems until I close the ones I've opened. Every task with a date and a number, or it's out. Every handover with a name.

The message I want to share is this: the mistakes you make aren't 150. They're few, and they repeat. The job isn't to stop getting things wrong, it's to recognise the jersey when it steps back on the court.

The Friday checklist

Nine questions, one per mistake. I use them at the end of the week: if an answer is “yes”, I know which trap I'm walking back into.

  1. Did I create something new to organise the work without closing anything important?
  2. Did I create more tasks than I closed, or rewrite a commitment for the third time?
  3. Is there a topic I've been putting off longer than the others?
  4. Is something waiting on another person for more than a week, without a name and a date?
  5. Is there a decision made on a call that isn't yet written where everyone reads it?
  6. Did I decide something based on a number I didn't check?
  7. Did I make a big change without checking the next day that it really went live?
  8. Did an event push a block of work on my lever?
  9. Am I bringing in more people than I can get playing?

If you do marketing in a startup and you see yourself in even one of these, drop me a DM. I'm curious to know which one is yours 😉

Simone, aka Tabba 🔥